betterjobs

Free checklist template · Word

IT Equipment Checklist

An IT equipment checklist helps IT and HR prepare everything a new joiner needs before and on day one: hardware, accounts, software, security settings and peripherals. Working through it phase by phase means the employee can start work on the first day instead of waiting for a laptop or login.

  • Editable Word (.docx)
  • Made for India
  • 15 fill-in fields highlighted
  • Free, no sign-up

Preview of the checklist

[Highlighted] = fill in
[Company Logo][Company Name]

IT EQUIPMENT AND SETUP CHECKLIST – NEW JOINER

Employee Name:
[Employee Name]
Employee ID:
[Employee ID]
Designation / Department:
[Designation] / [Department]
Date of Joining:
[Date of Joining]
Work Mode:
Office / Hybrid / Remote

Phase 1: Request (HR – 5 to 7 days before joining)

  • Joiner details shared with IT: name, role, department, manager, location, joining date
  • Standard kit for the role confirmed with [Reporting Manager]
  • Role-specific software and application access listed by manager
  • Phone / SIM requirement confirmed
  • Delivery address confirmed for remote joiner

Phase 2: Hardware Preparation (IT – 3 to 5 days before)

  • Laptop / desktop allocated from stock and asset-tagged ([Asset ID])
  • Device imaged with standard OS build and updates
  • Charger, mouse, keyboard and bag kept ready
  • Headset / webcam / second monitor arranged (if role requires)
  • Mobile handset and SIM prepared (if approved)

Phase 3: Accounts and Software (IT – 2 days before)

  • Directory / domain account created
  • Official email ID created: [Email ID]
  • Added to team distribution lists and chat channels
  • Office suite and collaboration tools licensed
  • Business applications provisioned: [Application Names]
  • VPN access created (if remote or hybrid)
  • Printer mapping and shared drive access configured

Phase 4: Security Setup (IT – before handover)

  • Disk encryption enabled
  • Antivirus / endpoint protection active
  • Device enrolled in MDM / asset management
  • Multi-factor authentication ready for first login
  • Local admin rights removed
  • USB storage policy applied

Phase 5: Day-One Handover

  • Device and accessories handed over; laptop issue form signed
  • First login and password change done in presence of IT
  • MFA app set up on employee's phone
  • IT acceptable-use and cybersecurity policy acknowledgement signed
  • Helpdesk contact and ticketing process explained
  • ID / access card issued by Admin

Completion

Pending items[Details]
Target date for pending items[DD/MM/YYYY]
Employee feedback on setup[Remarks]
IT Executive
[IT Executive Name]
Date: [Date]
Employee
[Employee Name]
Date: [Date]
HR
[HR Name]
Date: [Date]

What this template includes

  • Pre-joining requests triggered by HR with role and start date
  • Hardware preparation and asset tagging
  • Account creation for email, directory and business apps
  • Security setup: encryption, antivirus, MFA, MDM
  • Peripherals by role, such as headset or second monitor
  • Day-one handover and orientation on IT policies

When to use it

  • Preparing for a new joiner a week before the joining date
  • Onboarding a batch of trainees or freshers together
  • Setting up a remote employee whose kit must be couriered
  • Auditing whether a role's standard kit is complete

How to customise this template

  1. 1Add your standard kit per role or grade
  2. 2Insert the names of the business applications you use
  3. 3Set the number of days before joining each phase should start
  4. 4Assign an owner for each phase, for example HR, IT or admin
  5. 5For remote joiners, add courier and video-call setup steps

HR tips

  • Ask HR to share the joining details at least five working days in advance
  • Test the login on the actual device before handover
  • Keep spare chargers and headsets for day-one surprises
  • Record the asset IDs on the laptop issue form during handover

For HR & hiring managers

Hire top talent from BetterJobs

Experienced and fresher candidates across India — blue, grey and white collar. Post a job in 5 minutes and start receiving applications.

  • Post in 5 minutesDescribe the role in one line — we write the job description.
  • Verified applicantsEvery applicant has a verified mobile number.
  • Resume databaseSearch experienced candidates by skill, city and experience.

Frequently asked questions

What IT equipment does a new employee need?+

Typically a laptop or desktop, charger, mouse, headset, ID or access card, and a phone or SIM for certain roles, plus email, directory and business application accounts.

Who should own the IT onboarding checklist?+

IT usually owns it, but HR triggers it with the joiner's details and the manager confirms the role-specific software and access.

How early should IT start preparing for a new joiner?+

Ideally about a week before joining, so hardware can be imaged and accounts created and tested.